Signin|Signup|Forgot Password|Manage BizDev|Mobile Version|Contact|Cart
Enterprise MemberYear 1

Foshan Rongting Hotel Furniture Co., Ltd.  
Follow0

Furniture

Search
News
  • 暂无新闻
产品分类
  • 暂无分类
Contact


请先 登录注册 后查看


Search
 
Honor
  • 暂未上传
Link
  • 暂无链接
首页 > Product > Designer Hot Sale Stacking/Banquet Chair (RH-55002)
Designer Hot Sale Stacking/Banquet Chair (RH-55002)
单价 面议对比
询价 暂无
浏览 11
发货
库存 50
过期 长期有效
更新 2025-04-20 03:51
 
详细信息
We are specializing in the production of hotel furniture and accessories with top quality and service,such as,hotel chair,banquet chair,chiavari chair,restaurant chair,flex chair,banquet table,movable stage.Everything we can do is to provide the products with good quality at the reasonable price.

Hot Sale Stacking/Banquet Chair (RH-55002)
Item Name: Hot Sale Stacking Steel Hotel Wedding Chair
Item No.: RH-55002
Material Details:
1. Steel tube & Iron tube: 25*25*1.0mm
2. Foam: Molded seated cushion with high density foam
3. Fabric: 50% polyester, 50% cotton, vinyl is available
4. Paint & Powder: Coated finished with scratch resistant
5. We have lots of fabric and leather in color and design for your choosing. And can be made fireproof according to UK(BS5852)or US(CA117)standard.
Weight Details(Aluminum):
1. Net Weight: 6.2kgs
2. Gross Weight: 6.4kgs
Packing:
Bubble bag packing the backrest and chair leg first, Then packing by plastic bag to avoid the hit.
Loading:
585PCS/1*20GP 1200PCS/1*40GP 1350PCS/1*40HC(HQ)
Delivery Time:
10-20days/1*20GP 20-25days/1*40GP 25-30days/1*40HC(HQ)
Model No.RH-55002
Item NameHot Sale Stacking/Banquet Chair (RH-55002)
MaterialSteel+Foam+Fabric
Chair size940H*470SH*440W*600D(mm)
Tube size25*25*1.0mm
Tube colorGold, also you can choose silver, white, black, red wine, or other colors.
Seat cushionUse molded seated cushion with high density foam.
Stack10-15pcs/stack. Stackable design to save space and shipping costs
HandworkProfessional welding & burnish.
Finishspray painting or powder coating
N. W.6.2kg
G. W.6.4kg
Guarantee2 years
Delivery 10-20days/1*20GP 20-25days/1*40GP 25-30days/1*40HC(HQ), delivery on time
Loading585PCS/1*20GP 1200PCS/1*40GP 1350PCS/1*40HC(HQ)